Tuesday, June 10, 2014

on Leave a Comment

Mindo house

Work with the drainage system starts and with the rain in the afternoon it is quit muddy.

The floor starts to come into place.

Bathrooms taken care of

The kitchen still misses a design and will have to wait for some time still.



When will we ever be able to start taking care of the garden???

One of few small things that we have done in the garden, the kids prepared seeds of avocado that we brought to Mindo so it can start growing. 



The outside ares takes shape and Im dreaming about a BBQ in the future.

Stairs still missing but are on the way

0 comments:

Post a Comment